Skip to content

Environmental audit and consulting

Environmental audit of the contract area of the Uzbekiston Mustakilligi investment block in Surkhandarya region, Republic of Uzbekistan

  • Environmental audit and consulting;
  • Development of environmental regulation projects:
    • Waste generation standards and disposal limits;
    • Maximum permissible emissions (MPE) of harmful (polluting) substances into the atmosphere;
    • Standards for permissible discharges of substances and microorganisms into water bodies;
  • Development and revision of sanitary protection zone (SPZ) projects for enterprises and industrial hubs;
  • Development of the “List of environmental protection measures” as part of design documentation;
  • Environmental certification (eco-passports) of enterprises;
  • Preparation of materials for licensing hazardous waste management activities;
  • Environmental justification of urban planning documentation;
  • Comprehensive engineering and environmental surveys.
  • Supporting materials related to environmental safety:
    • development of environmental protection sections of design documentation for facilities in various industries;
    • design and organization of environmental monitoring systems;
    • field surveys of the current state of the environment and development of environmental forecasts;
    • environmental impact assessment (EIA) projects for existing and planned facilities in various industries;
    • development of maximum permissible discharge and emission standards for pollutants for enterprises and organizations;


Environmental projects completed by POLITEX

  • Environmental audit of the contract area of the Uzbekiston Mustakilligi investment block in Surkhandarya region, Republic of Uzbekistan;
  • “Preparation and state environmental expertise (SEE) of the draft Statement on Environmental Consequences (SEC) for 2D seismic surveys in the Sam-Kosbulak investment block, Kungrad district, Republic of Karakalpakstan, covering 1,000 linear km”
  • “Preparation of the SEC for 2D seismic surveys”;
  • “Preparation and SEE of the ‘Statement on Environmental Consequences of seismic surveys in the Sam-Kosbulak and Aral Sea blocks’”;
  • “Preparation and SEE of the ‘Draft Environmental Impact Statement (DEIS) for seismic surveys in the Sam-Kosbulak investment block, Kungrad district, Republic of Karakalpakstan, covering 1,000 linear km’”;
  • “Preparation of the draft SEC for the reactivation and production testing of wells at the Kandym field”;
  • “Preparation of the DEIS for the Kamerchina leather processing joint venture”;
  • “DEIS for geological exploration in the Koskuduk and Ashibulak investment blocks under the Exploration Agreement”;
  • “Preparation of Stage III of the EIA procedure, the Statement on Environmental Consequences (SEC), for the individual detailed design for the construction of the exploration wells Ashibulak-1 in the Ashibulak investment block and Beltau-1 in the Koskuduk investment block”;
  • “Preparation and SEE of the ‘Statement on Environmental Consequences (SEC, Stage III of the EIA procedure) for the construction of the exploration wells Xisha-102, E.Alat-1 and Kao-1 in the Karakul investment block’”;

Let’s discuss your project

Tell us about the task — an engineer will call back within one business day with a solution and a timeline.

Free consultation

Leave your phone number — an engineer will call back and answer your questions about the project.